
Cable Installation:
Follow the procedures below to install the cables:
1 - Loosen the two screws securing the junction box to
the sensor.
2 - Detach the sensor terminal box by pulling it by
hand.
3 - Locate the three screws holding the connectors in
the junction box.
4 - With the aid of a suitable screwdriver, loosen the
three screws from the terminal box to gain access to
the connectors.
5 - Disengage the cover holding the connectors to the
terminal box.
6 - Remove the locking nut and seal rubber from the
cable gland nº 1.
7 - Prepare the cable by baring its outer cover by
maximum 40 mm.
8 - We also recommend the use of pre-insulated
terminals at the ends of the wires, to avoid problems of
poor contact or short circuit.
4
Sense
Intelligent Valve Monitor
40
5
Alicate ZA3