Sengate TA-130-100 Manual Instruction Download Page 1

 1

100M/150M/200M/250 /300

M

M GROUND TOWER

anchor bolts

(M10x120) x4

 

hex nuts

(M10) x12

 

flat washer

(M10)

 

x4

sleeve anchors

(3/8"x 3") x4

 

TA-130-100 / TA130-150 / TA130-200 / TA130-250 / TA130-300

TA-120-100 / TA120-150 / TA120-200 / TA120-250 / TA120-300

MANUAL INSTRUCTION 

Thanks for purchasing                       product.  Read this instruction manual before using the product to make sure that you u e it correctly.

s

PRODUCT PARTS

PARTS DESCRIPTION

INSTALLATION METHOD

2

 top cover

 top cover

alum-extrusion

side bracket

tamper switch

U-shaped

cover

single-sided tower

double-sided tower

floor base unit x1

Optional Accessory

Heating Unit : HT-120

1. In one of the two top covers, 

for wiring.

2. Place the nuts in the top covers and insert the hex screw, screwing them slightly. Put the top cover onto the aluminium profile, 
    and tighten bolts fully.
3. Slide the hex screw along the alum-extrusion and then fix the side brackets with nut to it. 

drill holes in the marked areas to allow 

hex screw

(M8x16)

hex screw

(M8x16)

hex screw

(M4x10)

nuts (M4)

nuts (M8)

4. After the alum and side brackets installed on the ground, according to priority, fix the heating unit, back plate of beam unit then
    the supplied tamper switch near the top of the alum-extrusion.
5

.

 Be sure the tamper switch should be flush with the arm of tamper switch rests above the top line of the alum.

tamper switch

back plate of
beam unit

heating
unit

 ( the priority of installation ) 

heating units

( optional )

the edge
should be 
flush-with.

the arm of tamper switch
rests above the top line 
of the alum.

Reviews: