![Sengate TA-130-100 Manual Instruction Download Page 1](http://html1.mh-extra.com/html/sengate/ta-130-100/ta-130-100_manual-instruction_1239632001.webp)
1
100M/150M/200M/250 /300
M
M GROUND TOWER
anchor bolts
(M10x120) x4
hex nuts
(M10) x12
flat washer
(M10)
x4
sleeve anchors
(3/8"x 3") x4
TA-130-100 / TA130-150 / TA130-200 / TA130-250 / TA130-300
TA-120-100 / TA120-150 / TA120-200 / TA120-250 / TA120-300
MANUAL INSTRUCTION
Thanks for purchasing product. Read this instruction manual before using the product to make sure that you u e it correctly.
s
PRODUCT PARTS
:
PARTS DESCRIPTION
INSTALLATION METHOD
:
2
top cover
top cover
alum-extrusion
side bracket
tamper switch
U-shaped
cover
single-sided tower
double-sided tower
floor base unit x1
Optional Accessory
Heating Unit : HT-120
1. In one of the two top covers,
for wiring.
2. Place the nuts in the top covers and insert the hex screw, screwing them slightly. Put the top cover onto the aluminium profile,
and tighten bolts fully.
3. Slide the hex screw along the alum-extrusion and then fix the side brackets with nut to it.
drill holes in the marked areas to allow
hex screw
(M8x16)
hex screw
(M8x16)
hex screw
(M4x10)
nuts (M4)
nuts (M8)
4. After the alum and side brackets installed on the ground, according to priority, fix the heating unit, back plate of beam unit then
the supplied tamper switch near the top of the alum-extrusion.
5
.
Be sure the tamper switch should be flush with the arm of tamper switch rests above the top line of the alum.
tamper switch
back plate of
beam unit
heating
unit
( the priority of installation )
heating units
( optional )
the edge
should be
flush-with.
the arm of tamper switch
rests above the top line
of the alum.