700mV Over
250mV to 700mV
250mV Under
0.7
0.05
( Receiver )
50ms
300ms
700ms
0.3
Set Transmitter and Receiver at the same channel.
1CH
2CH
3CH
4CH
1CH
3CH
1CH
3CH
TR.
RE.
TR.
RE.
1CH
1CH 1CH
1CH 3CH
3CH
TR.
RE.
TR.
RE.
TR.
RE.
2-stacked protection
Line protection
Line & 2-stacked protection
ADJUST THE UPPER LENS
Fast running
Slow speed
Normal walking
Response time (sec.)
The beam interruption time adjustment is on Receiver unit. Speeds
shown below are the maximum detectable speeds for each setting.
NOTE:
After installation, response time testing is required. This function allows
you to match the units sensitivity to its surroundings.
The environmental signal is initiated if the beam reception level is reduced
under certain situation.
NOTE:
(1) Above readings is under attenuation sheet operation.
(2) Carefully remove the attenuation sheet, and check the voltage from the
monitor jack again.
SENSITIVITY CHART
Monitor Jack Output
Alignment Level
Best
Good
Poor, Realign
7-1. Apply power to both Transmitter and Receiver.
7-2. Looking through the view finder, locate the other detector in the
center of the sights by adjusting vertically and horizontally.
Refer to the figures and set the beam channel when two or more
units are installed in stacked protection or in line protection.
When stacked protection is set up, both the upper and lower
sensors should be the same model number types.
Horizontal Adjustment
( Rough )
Horizontal Adjustment
( Fine )
1CH
1CH 1CH
1CH 2CH
2CH
3CH
3CH 3CH
3CH 4CH
4CH
TR.
RE.
TR.
RE.
TR.
RE.
Meter Probe (+)
Meter Probe (-)
Attenuation Sheet
ADJUST THE LOWER LENS
1
2
1
2
3
Vertical Adjustment
( Fine )
4
7-3. Connect the volt- meter (DC10V) to monitor jack input on Receiver's
(+) and (-), then fine turn optical alignment.
7-4. Place attenuation sheet on both Transmitter and Receiver (lower lens).
7-5. Respectively adjust the optical alignment horizontally & vertically on
both Transmitter and Receiver (upper side) to obtain the maximum
voltage (700mV over) from the monitor jack.
7-6. Place attenuation sheet on both Transmitter and Receiver (upper lens).
7-7. Respectively adjust the optical alignment horizontally & vertically on
both Transmitter and Receiver (upper side) to obtain the maximum
voltage (700mV over) from the monitor jack.
7-8. Taking off attenuation sheet, metwe probe.
6.BEAM FREQUENCY CHANGE
5.RESPONSE TIME ADJUSTMENT
7.ALIGNMENT AND OPERATION
Beam Channel
8.FUNCTIONS DESCRIPTION
View Finder