Sengate 4PH-75BQE Quick Start Manual Download Page 3

700mV Over

250mV to 700mV

250mV Under

0.7

0.05

( Receiver )

50ms

300ms

700ms

0.3

Set Transmitter and Receiver at the same channel.

1CH

2CH

3CH

4CH

1CH

3CH

1CH

3CH

TR.

RE.

TR.

RE.

1CH

1CH 1CH

1CH 3CH

3CH

TR.

RE.

TR.

RE.

TR.

RE.

2-stacked protection

Line protection

Line & 2-stacked protection

ADJUST THE UPPER LENS

Fast running

Slow speed

Normal walking

Response time (sec.)

The beam interruption time adjustment is on Receiver unit. Speeds
shown below are the maximum detectable speeds for each setting.

NOTE:

After installation, response time testing is required. This function allows
you to match the units sensitivity to its surroundings.

The environmental signal is initiated if the beam reception level is reduced
under certain situation.

NOTE:

(1) Above readings is under attenuation sheet operation.
(2) Carefully remove the attenuation sheet, and check the voltage from the

monitor jack again.

SENSITIVITY CHART

Monitor Jack Output

Alignment Level

Best

Good

Poor, Realign

7-1. Apply power to both Transmitter and Receiver.
7-2. Looking through the view finder, locate the other detector in the

center of the sights by adjusting vertically and horizontally.

Refer to the figures and set the beam channel when two or more

units are installed in stacked protection or in line protection.

When stacked protection is set up, both the upper and lower
sensors should be the same model number types.

Horizontal Adjustment
( Rough )

Horizontal Adjustment
( Fine )

1CH

1CH 1CH

1CH 2CH

2CH

3CH

3CH 3CH

3CH 4CH

4CH

TR.

RE.

TR.

RE.

TR.

RE.

Meter Probe (+)

Meter Probe (-)

Attenuation Sheet

ADJUST THE LOWER LENS

1

2

1

2

3

Vertical Adjustment
( Fine )

4

7-3. Connect the volt- meter (DC10V) to monitor jack input on Receiver's

(+) and (-), then fine turn optical alignment.

7-4. Place attenuation sheet on both Transmitter and Receiver (lower lens).
7-5. Respectively adjust the optical alignment horizontally & vertically on

both Transmitter and Receiver (upper side) to obtain the maximum
voltage (700mV over) from the monitor jack.

7-6. Place attenuation sheet on both Transmitter and Receiver (upper lens).
7-7. Respectively adjust the optical alignment horizontally & vertically on

both Transmitter and Receiver (upper side) to obtain the maximum
voltage (700mV over) from the monitor jack.

7-8. Taking off attenuation sheet, metwe probe.

6.BEAM FREQUENCY CHANGE

5.RESPONSE TIME ADJUSTMENT

7.ALIGNMENT AND OPERATION

Beam Channel

8.FUNCTIONS DESCRIPTION

View Finder

Reviews: