background image

MI00564-0-EN

INSTALLATION MANUAL

4/4

CONNECTION TO THE MAIN MODULE

INSTALLATION ON DIN-IEC EN 60715 RAIL

Installation:

Position the device on the OMEGA rail resting the upper 

teeth from top to bottom.

Push the lower part towards the rail until the locking sys-

tem engages.

Removal:

After switching off the module, with the help of a slotted 

screwdriver, unlock the locking system located on the 

underside of the instrument.

Installation:

To connect the R-COMM accessory module to the R-PASS main module, position the instrument on the DIN rail as shown 

in the procedure below, then slide the module until it is fully engaged with the side connector.

After the correct connection, the PWR led turns on to show the power supply.

The connection of the R-COMM accessory module must be made with the R-PASS main module turned off.

N.B.: 

For an ideal operation of the module, the use of a DIN rail clamp is recommended.

CAUTION

Reviews: