
Repeat on the other side using the middle marker point to secure the surface to the substructure.
Remove the clamps and then drill and fix at all remaining marker points. There are 4 more. 2 above the hinges and 2 in the
centre of the arrow.
Turn the entire Structure over. You will see the 3 marker holes in Baton PG H. Place one of the 4 x 30 Stainless Steel Screws
beside the drill bit and use a piece of tape to mark HOLE DEPTH. IF you drill too deep you will go through the SURFACE of the
RAMP! The Drill holes should be 1 / 2 mm shorter than the Screw. Drill and Secure all 3 points with 4 x 30 Screws. Beware the
Stainless Steel Screws are SOFT! Rounding the heads is possible if you DO NOT apply constant pressure.
STAGE 5:
PLEASE SKIP THIS STAGE IF THE SIDE PANELS ARE IN ONE SECTION (Do Not Need Hinges!)
Select the REAR SIDE PANELS and FOLDING LEGs. Place them together as shown. Take 2 No hinges and place them between the
marker lines on the face of the REAR SIDE PANELS and LEGS. Centralise / Line the hinge with the join. Place one screw centrally
in the hinge on one side of the join. Place the second screw in the opposing hole! IT IS ESSENTIAL THAT THIS SECOND SCREW IS 1
mm OFF CENTRE TOWARDS THE LONG EDGE OF THE HINGE! This helps pull the parts together.