
47
ProBee-ZE10 User Guide Rev.1.1
Figure 6-4 Example #2: 1 Coordinator and 2 End Devices
6.5.1
Coordinator Configuration
Hardware configuration for the coordinator is as follows:
Set the HOST switch to UART
Connect a serial cable between a host computer and the coordinator
The AT commands for coordinator configuration is as follows:
AT+NODETYPE=1
OK
AT+PANID=7772
OK
ATZ
OK
6.5.2
End-devices Configuration
Hardware configuration for the coordinator is as follows:
Set the GPIO_OUT switch to LED_ON
The AT commands for the end devices are as follows:
AT+NODETYPE=4
OK
AT+PANID=7772
OK
AT+GPIO=3333333333333
OK