EV Charging Station Installation Guide
11
Rev.201901
SemaConnect Wall/Pole Mount Installation
Follow the same procedure for Wall and Pole mount installation.
Wall/Pole Mount Installtion Procedure
Step-1:-
Install the circuit Breaker, run the electrical conduit
Caution-1:- After circuit breaker is installed, make sure it’s turned off.
Step-2:-
Attach Wall/Pole Mount Bracket
a.
If Wall-Mount:- Attach Wall Mount Bracket to wall with 4 bolts.
b.
If Pole-Mount:- Attach Pole Mount Bracket with three straps.
In both cases electrical conduit can run from the back or the side. Also make sure that the wall
mount is level.
Preparing the SemaConnect
TM
620/520 head Unit
Step-3:-
Loosen the Set screws in the head unit and attach Cable rack to charging Station (Figure-1).
Step-4:-
Remove the access panel
Step-5:-
Place the J1172 in the holder and hang the cable in the cable rack(Figure-1).
Assembly of SemaConnect
TM
620/520 onto Wall/Pole mount
Figure-1
Figure-2
Figure-3