Seiki Vista Plus Screen Installation Manual Download Page 4

Mounting Surface

Mounting Surface

4

Getting to Know the

Vista Plus Screen

Before beginning the installation process,
become familiar with the Vista Plus Screen
and the door on which it will be installed.

The Vista Plus Screen can be installed on both
in-swing and out-swing doors. In-swing doors open
to the inside of the home and require the Vista Plus
Screen to be installed on the outside of the home.
Out-swing doors open to the outside of the
home and require the Vista Plus Screen to be
installed on the inside of the home.

Does the Vista Plus Screen fit
the Door Opening?

Make sure the Vista Plus Screen will fit the door. The
Vista Plus Screen will accommodate a door
opening of up to 36” (914 mm) wide and
81 1/4” (2,064 mm) high. If the door opening is
larger than this, the Vista Plus Screen can still be
installed by attaching a filler strip under the door
frame to reduce the height of the door opening.
Refer to page 6 for details.

Is there enough Mounting Surface for
the Vista Plus Screen?

The Vista Plus Screen is a recess mount screen
which installs on the inside surface of the door frame
(Mounting Surface as indicated in diagram 

(A)

). To ensure

that the Vista Plus Screen is fullly recessed after
installation, there must be at least 1 5/8” (42 mm)
of mounting surface. However the Vista Plus Screen
can accommodate a minimum mounting surface of
1 1/8” (28 mm). In this instance, the Mounting
Bracket of the Vista Plus Screen will extend slightly
beyond the door frame. This mounting surface must
be flat and flush, and at a right angle (90º) to the door.

Bottom Rail
Type A or B

Catch
Frame

Top Rail
End Cap

Top Rail

Sliding Bar

Top Cap

Sliding Bar

Screen

Housing

Mesh Lock

Adjuster

Spring Tension

Adjuster

Retracting

Mesh Guide

Sliding Bar 
Bottom Cap

Catch

One Touch 
Latch

Is the Door Opening Square?

For the Vista Plus Screen to operate effectively, the
door opening must be perfectly square. Using a
Carpenter Square, check to ensure that the door
frame is square. If not, use shims to bring the door
frame to square before beginning installation.

Is this Vista Plus Screen being installed
on a Right Hinged Door?

Finally, make sure the right model has been
purchased!  The Vista Plus Screen in this package is
configured for a “RIGHT” hinged door. To identify door
hinging, look at the door from the side on which the
Vista Plus Screen will be mounted. The hinges should
be on the right side and the door knob or handle
should be on the left.

A

Summary of Contents for Vista Plus Screen

Page 1: ...tallation Manual for For right hinged doors Durable Reliable Attractive For door openings up to 36 914 mm wide and 81 1 4 2 064 mm high Quick and Easy to Size and Install Vista PLUS SCREEN PX11 0601R...

Page 2: ...Screen will provide years of dependable operation Plus it comes with a factory supplied limited lifetime warranty on all parts against manufacturer s defects The Vista Plus Screen was designed for eas...

Page 3: ...he Screen Housing 10 Installing the Top Rail 11 Installing the Bottom Rail 12 Final Steps 13 For installations on double doors French doors one left Vista Plus Screen and one right Vista Plus Screen a...

Page 4: ...rface as indicated in diagram A To ensure that the Vista Plus Screen is fullly recessed after installation there must be at least 1 5 8 42 mm of mounting surface However the Vista Plus Screen can acco...

Page 5: ...crews 2pcs for Bottom Rail Stickers 2pcs for Latch Top Rail Before beginning make sure that all these parts are included in the Vista Plus Screen package Hack saw 32tpi Philips screwdriver Electric dr...

Page 6: ...oor sill at the point where the Vista Plus Screen will be installed Seiki recommends positioning the Vista Plus Screen flush with the outside edge of the door frame the furthest point away from the do...

Page 7: ...d Bottom Rails To determine the length to be cut from the Top and Bottom Rails use the following formula Determining Length to be Cut from Screen Housing Assembly and Catch Frame To determine the leng...

Page 8: ...sills Please refer to B to determine the correct Bottom Rail 1 Using the same Length to be cut dimension used for the Top Rail measure and mark the appropriate Bottom Rail on all sides to ensure an ev...

Page 9: ...gned with top of the Assembly and the mesh B 3 Slide the Mounting Bracket until its upper edge is aligned with the upper edge of the Screen Housing Assembly C 4 With all components aligned carefully m...

Page 10: ...Mounting Bracket will be positioned with this edge closest to the door 2 Remove the adhesive strip on the back of the Mounting Bracket and position on the mounting surface B 3 Using a level adjust the...

Page 11: ...secure with the 1 1 4 32 mm Wood Screws provided Installing the Catch Frame 1 Insert the Catch Frame into the bottom of the Top Rail End Cap Ensure that the Top Rail End Cap fits tight to the left sid...

Page 12: ...sill 3 Position the other end so that the center of the Catch Frame aligns with the center of the Bottom Rail C When aligned press the Bottom Rail firmly onto the door sill 4 Fasten the Bottom Rail to...

Page 13: ...ration A until meeting with resistance but without over tightening Adjusting Spring Tension 1 If the Vista Plus Screen does not retract fully or quickly enough turn the dial on the Spring Tension Adju...

Page 14: ...dirt and debris and may cause the Vista Plus Screen to react abnormally However the periodic application of a dry silicon lubricant to the moving parts is permissible We recommend that while not in u...

Page 15: ...entire process If there are any questions during the installation of the Vista Plus Screen we recommend visiting the Seiki Website at www seikiscreensystems com na Seiki provides a number of online ma...

Page 16: ...arranty is restricted to the corrective actions as set forth herein and contrarily repudiates all incidental and consequential damage It is the responsibility of the consumer to notify Seiki Screen Sy...

Reviews: