![Segen Solar EPM Plus 5G Quick Setup Manual Download Page 6](http://html1.mh-extra.com/html/segen-solar/epm-plus-5g/epm-plus-5g_quick-setup-manual_1233786006.webp)
AN_EPM_SOL_Ver0.
0
Setting 3: Set Meter CT
The CT ratio is set according to the installed CTs. Because all the CTs used for the EPM must have a
secondary 5A current, the ratio is obtained by dividing the Primary Current/Secondary Current e.g.,
a 200:5 CT will be 0040:1
Setting: FailSafe
Must be set to run. This is a safety feature that stops inverter production should the EPM fail for any
reason.
Setting: Set EPM Regulator
This is to set the capacity of the generation plant, so the value will be the total of all inverters
added up together.