3.
INSTALLATION AND MAINTENANCE INSTRUCTIONS
·
Installation and maintenance should only be carried out by QUALIFIED SERVICE
PERSONNEL.
3.1. HANDLING AND INSTALLATION PRECAUTIONS
When installing or inspecting the machine, be very careful of the following points and pay attention to ensure
that the player can enjoy the game safely.
The game must NOT be installed under the following conditions:
·
Outside, the game is designed for indoor use only.
·
In areas directly exposed to sunlight, high humidity, dust, excessive heat or extreme cold.
·
In locations that would present an obstacle in the case of an emergency i.e. near fire equipment or
emergency exits.
·
On unstable surfaces or surfaces subject to vibration.
·
Where liquids, other than routine cleaning, may come into contact with the game.
Important:
·
This machine should only be installed by Qualified Service Personnel.
·
Be sure to switch the supply power OFF and remove the mains supply plug from the machine before any
work is carried out on the machine.
·
Do not attempt to repair the PCB’s (Printed Circuit Boards) yourself. This will void the warranty. The
PCB’s contain static sensitive devices that could be damaged.
·
Always return a faulty part to your distributor with adequate packaging and protection.
·
When removing the plug from the mains always grasp the plug not the cable.
·
Do not use a fuse that does not meet the specified rating.
·
Make sure all connections are secure before applying power.
·
Ensure that the mains lead is not damaged. If the mains lead is damaged in any
way there could be a danger of electric shock or a fire hazard.
·
Ensure that the power supply is fitted with circuit protection. Using the power
supply without circuit protection is a fire hazard.
3.2. COIN
HANDLING
Standard Sega machines are fitted with a SR3 coin mechanism, however, as a service to our customers
Sega machines can be supplied with no coin mechanism or door allowing the customer to fit a coin handling
option from the approved list. Fit only the coin handling arrangements detailed below and follow the
instructions provided in section 4. Failure to fit the coin handling options detailed or failure to follow the
installation instructions will render the machine, under the CE marking directive, void.
Approved coin handling options:
·
Coin controls SR3
·
Generic mechanical
·
Mars (MS111B1 and ME115)
·
SECI RM4-G20
3.3. NAME OF PARTS
5
Summary of Contents for THE KING OF ROUTE 66
Page 2: ...SAFETY WARNINGS i...
Page 3: ...ii...
Page 4: ...iii...
Page 5: ...iv...
Page 6: ...v...
Page 7: ...vi...
Page 8: ...vii...
Page 9: ...viii...
Page 10: ...ix...
Page 11: ...x...
Page 12: ...xi...
Page 13: ...xii...
Page 14: ...xiii...
Page 15: ...xiv...
Page 16: ...xv...
Page 17: ...xvi...
Page 18: ...xvii...
Page 19: ...xviii...
Page 20: ...xix...
Page 21: ...xx...
Page 22: ...xxi...
Page 23: ...xxii...
Page 24: ...xxiii...
Page 25: ...xxiv...
Page 26: ...xxv...
Page 27: ...xxvi...
Page 28: ...xxvii...
Page 29: ...xxviii...
Page 30: ...xxix...
Page 31: ...xxx...
Page 32: ...xxxi...
Page 33: ...xxxii...
Page 34: ...xxxiii...
Page 35: ...xxxiv...
Page 36: ...xxxv...
Page 37: ...xxxvi...
Page 38: ...xxxvii...
Page 39: ...xxxviii...
Page 40: ...xxxix...
Page 41: ...xl...
Page 42: ...xli...
Page 43: ...xlii...
Page 44: ...xliii...
Page 45: ...xliv...
Page 46: ...xlv...
Page 47: ...xlvi...
Page 48: ...xlvii...
Page 49: ...xlviii...
Page 50: ...xlix...
Page 51: ...l...
Page 52: ...li...
Page 53: ...lii...
Page 54: ...liii...
Page 55: ...liv...
Page 56: ...lv...
Page 57: ...lvi...
Page 58: ...lvii...
Page 59: ...lviii...
Page 60: ...lix...
Page 61: ...lx...
Page 62: ...lxi...
Page 63: ...lxii...
Page 64: ...lxiii...
Page 65: ...lxiv...
Page 66: ...lxv...
Page 67: ...lxvi...
Page 68: ...lxvii...
Page 69: ...lxviii...
Page 70: ...lxix...
Page 71: ...lxx...
Page 123: ...5 2 2 JVS TEST 50...
Page 151: ...8 2 RTS 10002UK ASSY CABI STD 78...
Page 166: ...8 15 PTR 2200UK ASSY 3 WAY SHIFTER W HARN 93...
Page 174: ...101...
Page 175: ...102...