- 23 -
1.Link adjustment
Cable link SET-UP
The link set-up must follow DIP-SW-SEP-UP N0.1~15 machines.
Intermittent allowed, but repeat.
A . Link up to 15 machines
B . Only one main frame is needed.
C . Any game could be used as the main frame.
P.S. If two link machines-2 PCB are connected, the main control one DIP-SW must be set
as OFF OFF OFF ON.
The link machines must
stand side by side
The main part back view
Link Plug connect
Link
sub-board
PC Board
DIPSW
DIPSW
DIPSW
Link Plug connect
The link machines must
stand side by side
The main part front view
Link
sub-board
Link
sub-board
PC Board
PC Board
Link sub-board
Link PC board