background image

20

A

F

21

A

F

13

E

E

02

F

02

TOOLS REQUIRED

HARDWARE REQUIRED

A

02

STEP 16

13 -

x1

CENTRE DRAWER FRONT

PARTS REQUIRED

20 -

x1

LEFT CENTRE DRAWER SIDE

21 -

x1

RIGHT CENTRE DRAWER SIDE

E

SEC/SH/08/20/ZF2

Page 13

STEP 20

20 -

x1

LEFT CENTRE DRAWER SIDE

PARTS REQUIRED

TOOLS REQUIRED

HARDWARE REQUIRED

D

04

21 -

x1

RIGHT CENTRE DRAWER SIDE

22 -

x1

CENTRE DRAWER BACK

23 -

x1

DRAWER BASE 

4x38mm

13

21

22

20

D

D

D

23

13 -

x1

CENTRE DRAWER FRONT

STEP 19

Summary of Contents for NORDIC 3 DRAWER BEDSIDE

Page 1: ...NORDIC 3 DRAWER BEDSIDE ASSEMBLY INSTRUCTIONS DO NOT USE SEC SH 08 20 ZF2 Page 01...

Page 2: ...1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S100 103 055 ZF1 13 13 Shelf Panel Centre Drawer Front 1 1 1 1 14 15 16 17 18 S100 103 055 ZF1 14 S100 103 055 ZF1 15 S100 103 055 ZF1 16 S100 103 055 ZF1 17 S100 103...

Page 3: ...panel Do not overtighten or undertighten see example below Shoulder Panel Panel HARDWARE LIST SEC SH 08 20 ZF2 Page 03 A No Part Name Qty Wooden Dowel 6x25mm B 45mm Screw 4x45mm C 16mm Screw 3 5x16mm...

Page 4: ...UIRED E 08 STEP 2 5 x1 RIGHT BOTTOM SIDE PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED 6x25mm A 08 I 02 C 04 SEC SH 08 20 ZF2 Page 04 3 5x16mm 3 x1 SHELF PANEL 4 x1 SHELF PANEL E 4 E E 3 E E A...

Page 5: ...IRED 6x25mm A 08 I 02 C 04 STEP 4 SEC SH 08 20 ZF2 Page 05 A 9 A 8 I C C I C C A A A A A A 8 x1 LEFT TOP SIDE PANEL I C C I C C A 7 A A A 10 A A A 9 x1 RIGHT CENTRE SIDE PANEL PARTS REQUIRED TOOLS REQ...

Page 6: ...EP 6 3 x1 SHELF PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED 4x45mm B 02 SEC SH 08 20 ZF2 Page 06 7 x1 RIGHT TOP SIDE PANEL 8 x1 LEFT TOP SIDE PANEL 9 x1 RIGHT CENTRE SIDE PANEL 6 7 8 9 F 08...

Page 7: ...LS REQUIRED HARDWARE REQUIRED B 04 STEP 8 4 x1 SHELF PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED B 02 SEC SH 08 20 ZF2 Page 07 4x45mm 8 7 B B 8 x1 LEFT TOP SIDE PANEL 4 5 6 5 x1 RIGHT BOTTOM...

Page 8: ...EP 9 PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED B 04 STEP 10 1 x1 TOP PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED B 04 SEC SH 08 20 ZF2 Page 08 2 x1 BOTTOM PANEL B B B 1 2 4x45mm B 4x45...

Page 9: ...OOLS REQUIRED HARDWARE REQUIRED C 16 G 04 STEP 12 24 x1 BOTTOM BACK PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED H 34 SEC SH 08 20 ZF2 Page 09 C G G G 3 5x16mm 24 26 25 25 x1 TOP BACK PANEL 2...

Page 10: ...RAWER BACK E 02 F 02 11 x1 BOTTOM DRAWER FRONT 23 x1 DRAWER BASE 4x38mm 11 x1 BOTTOM DRAWER FRONT STEP 13 PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED A 04 STEP 14 PARTS REQUIRED SEC SH 08 20 ZF2 P...

Page 11: ...RE REQUIRED A 04 STEP 15 PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED STEP 16 12 x1 TOP DRAWER FRONT PARTS REQUIRED SEC SH 08 20 ZF2 Page 11 17 x1 LEFT TOP DRAWER SIDE 18 x1 RIGHT TOP DRAWER SIDE C...

Page 12: ...REQUIRED TOOLS REQUIRED HARDWARE REQUIRED D 04 SEC SH 08 20 ZF2 Page 12 18 x1 RIGHT TOP DRAWER SIDE 19 x1 TOP DRAWER BACK 23 x1 DRAWER BASE 4x38mm 23 17 18 19 D D D 12 STEP 18 PARTS REQUIRED TOOLS REQ...

Page 13: ...20 x1 LEFT CENTRE DRAWER SIDE 21 x1 RIGHT CENTRE DRAWER SIDE E SEC SH 08 20 ZF2 Page 13 STEP 20 20 x1 LEFT CENTRE DRAWER SIDE PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED D 04 21 x1 RIGHT CENTRE D...

Page 14: ...STEP 15 PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED C 04 I 01 3 5x16mm J 01 C I C I I C C J STEP 21 STEP 22 PARTS REQUIRED SEC SH 08 20 ZF2 Page 14...

Reviews: