
IMPORTANT NOTICE FOR THE INSTALLER
−
The centre must not have any type of sectioning mechanism
from the electrical line 230 Vac; it is therefore the responsibility of
the installer to see the installation of a sectioning device within the
plant.
−
The fixing of the electricity supply cables and their connection,
must be guaranteed by means of the assembly of the cable
presses.
SEAV s.r.l.
declares that the products
Receiver RXH 2167 230V
Receiver RES 2167 230V
Receiver RXS 2167 230V
Comply with the requirements of Directives R&TTE 99/5/EC, EMC
2004/108/EC, LVD 2006/95/EC.
Rev 1.3 04/07