Seav R 2167 Series Quick Start Manual Download Page 2

IMPORTANT NOTICE FOR THE INSTALLER

The centre must not have any type of sectioning mechanism

from the electrical line 230 Vac; it is therefore the responsibility of  

the installer to see the installation of a sectioning device within the  

plant.

The fixing of the electricity supply cables and their connection, 

must   be   guaranteed   by   means   of   the   assembly   of   the   cable 

presses.

SEAV s.r.l.

 declares that the products

Receiver RXH 2167  230V

Receiver RES 2167  230V
Receiver RXS 2167  230V

Comply with the requirements of Directives R&TTE 99/5/EC, EMC 

2004/108/EC, LVD 2006/95/EC. 

Rev 1.3   04/07

Reviews: