background image

 

  

 

Puff J/105 

Quick Guide 

 

 

 

 

 

Summary of Contents for Puff J/105

Page 1: ... Puff J 105 Quick Guide ...

Page 2: ...1 Engine Starting 1 Bilge Pump Stop Engine 1 Electric Bilge Pump 4 Manual Bilge Pump 4 Electrical Electrical Panel 2 General Notes House Battery Switch 2 Stove 4 Battery Charging 2 Galley Sink 4 Monitoring Batteries 2 Head Sink 4 DC Panel 2 Hot Water Heater 4 Anchor 4 Electronics GPS Chart Plotter 2 Deck Plate Thru Hull Locations Depth Wind Instruments 2 Diagram 5 Sails Rigging Inventory Headsail ...

Page 3: ...se until it clicks into place To increase speed continue to move the lever forward or reverse watching the tachometer to ensure speed isn t too high To disengage transmission pull out the silver button and move the lever to port Speed can be adjusted when the lever is moved port or back transmission is disengaged as long as the silver button is out Engine Starting 1 Pull out the silver button to t...

Page 4: ...tter N A Depth Speed Wind Instruments Located on either side of the helm To Use 1 In main cabin turn Instruments switch on the DC panel to on 2 Depth speed and wind will read automatically Sails Headsail Jib that can be furled in to work as a storm jib Unfurl slowly on windy days Mainsail Outhaul is under the boom Cunningham attaches at the mast above gooseneck Boom vang adjustments run back to co...

Page 5: ...pen which is under the v berth port side Head Operation 1 Move selector switch to wet bowl 2 Pump 3 5 times to allow water into the bowl 3 After use move the selector switch to dry bowl and pump contents until the bowl is empty 4 Move the switch back to wet bowl pump again a few times to bring in water then change to dry bowl pumping water through until the bowl is empty ...

Page 6: ...g through and out the bilge exit thru hull Pumping will become easier as water exits the boat 3 Remove handle and place back in chart table 2nd manual bilge pump is located in the port aft locker Handle is stowed next to the pump Extend hose to bilge before use Operation is the same as above General Notes Refrigeration N A Stove Alcohol based Galley Sink Seacock located in a cabinet under the sink...

Page 7: ......

Page 8: ...nguishers 2 Port side of companionway starboard galley First Aid Kit 2 1 Galley 2 Head Flashlight 1 Inside yellow safety box located in starboard locker in head area PFD s Type I 7 Hanging in starboard locker in head area PFD Type IV throwable 2 1 Square cushion behind port settee 2 Life ring behind starboard setee Tool Repair Kit 1 Drawer under chart table Vessel registration 1 Taped to bulkhead ...

Page 9: ...Safety Equipment Diagram ...

Reviews: