background image

Copy Part# 470718, Rev. B, 02/2014 

Page 3 of 3

INSTALLATION INSTRUCTIONS

© 2003 Marine Canada Acquisition Inc. DBA SEASTAR SOLUTIONS  3831 No. 6 Road, Richmond, B.C. Canada V6V 1P6 

Fax: 604.270.7172 

Web: www.seastarsolutions.com

  Step 5

 

• Close the cylinder bleed fitting and move the by-pass line to 

 

 

  the second bleeder. Open the bleeder by turning loosening the 

 

 

  bleeder nut 3/4 of a turn.

 

 

• Return to the helm closest to the cylinder and turn the wheel 

 

 

  counter clockwise until the cylinder moves to hard over in the 

 

 

  opposite direction.

 

 

• When the cylinder reaches hard over, begin turning in a 

 

 

  clockwise direction for approximately 80 turns at a one to two 

 

 

  second per revolution pace.

 

 

• At each successively higher helm station, turn the wheel 

 

 

  clockwise approximately 80 turns at a one to two second per 

 

 

  revolution pace.

 

 

• When finished, close the cylinder bleed fitting.

  Step 6

 

• Release the air pressure from the reservoir.

 

 

• Remove the quick connect adapter and fill the reservoir to the 

 

 

  maximum level line.

 

 

• Replace the reservoir fill plug and pressurize the reservoir to 

 

 

  between 25 and 30 PSI.

•  With the power steering pump(s) running, turn one of the helm 

pumps from lock to lock approximately 20 times. If the pumps 

are engine driven, run the engines between 600 and 800 RPM 

for half the turns then increase the engine speed to about 

1200 RPM.

•  Check the fluid level in the reservoir. If it is less than half, 

release the air pressure, remove the filler plug and fill to the 

maximum line.

•  Pressurize the reservoir to between 25 and 30 PSI.

Before continuing to a higher station, check the fluid level and 

air pressure in the reservoir. If the fluid level is below half, 

release the air pressure and refill to the maximum level line 

and pressurize the reservoir to between 25 and 30 PSI.

If all the air is out of the system, when the reservoir is pressurized, 

the fluid level will remain stable. If the fluid level drops more than 

an inch and then stabilizes, the system should be purged a 

second time.

NOTICE

NOTICE

Purging the Power Circuit

Reviews: