
3 of 4
Operation
Test for Timer Output. To test the timer (either timer in
the case of the PT35) press the "TEST 1" or "TEST 2"
button. The red output indicator should light, and re-
main on for the previously-set number of seconds.
Standard Operation. After setting (when the unit has
returned to normal operation, indicated by no blinking
indicators) any display can be selected at any time by
turning the knob. For the PT35, turning the knob clock-
wise causes clockwise rotation among the indicator
lights. Stop turning the knob after arriving at the de-
sired display. This is the display that will remain until
another display is selected.
PT34 CONNECTIONS DIAGRAM
PT35 CONNECTIONS DIAGRAM
GND
SIGNAL
EXTERNALLY-PACED
METERING PUMP
DRY CONTACT
TYPE METER (MR,WPR)
GND
GND
SIGNAL
SIGNAL
+12 VDC
+12 VDC
PUMP+
SOLID STATE TYPE
METER (ME,IP,WT)
SOLID STATE TYPE
METER (ME,IP,WT)
INPUT CONNECTIONS
NO NC N G
Ground
Neutral
Hot Normally Closed
Hot Normally Open
H V G
P
G
S
V
OUTPUT
Ground
Neutral
Hot
3AG-5A-SB Fuse
POWER
Ground
Neutral
Hot
NO NC N G
NO NC N G
Hot Normally Open
Hot Normally Closed
Neutral
Ground
Ground
Neutral
Hot Normally Closed
Hot Normally Open
H V G
P
G
S
V
OUTPUT 1
OUTPUT 2
3AG-10A-SB Fuse
POWER
AR
CH
IVE
D