12
Step 10
Slide the Day Marks into position. The top of the Day Mark post fits over the Locating Post on the Day
Mark Mounting Bracket, fitted below the corners of the Solar Panels. Secure the base of the Day Mark
Post to the base of the Tower Assembly using the M10 Bolts, Nuts, Flat and Spring Washers per post.
Please Note: The Locating Post on the Day Mark Mounting Bracket may have to be loosened when
fitting Day Marks. Please ensure the Location Posts are secured afterward.
Step 11
Fit the ladder to the Tower Assembly.
Secure the Ladder Mounting Plate to the base of the ladder using two M10 x 25mm Long Bolts, Nuts,
Flat and Spring Washers.
Secure the Ladder Mounting Plate to the Mooring Post using 2 x M10 x 45mm Bolts, Nuts, Flat and
Spring Washers.
Step 12
Finish securing the Tower Assembly to the Mooring Post.
Check that all M10 x 90mm Long Bolts Nuts, Flat and Spring Washers are secured correctly.
Step 13
Lift the Buoy, ONLY using the Lifting Eyes on the Mooring Post.
Please do not leave the Buoy lying on the Float Sections,
they may deform while in this position if left of more than 1 hour.