Latest products and information available at www.sealite.com
9
TRIDENT-1400
1400mm dia. Navigation Buoy
Step 3
Lift and secure the tower assembly onto the mooring post. The tower should be positioned with the
ladder at the middle point of the two lifting eyes.
Secure the tower to the deck plate in 16 places using M10x70mm long bolts, flat and spring washers
and nuts.
Please coat each bolt in Anti-seize or molybdenum disulphide grease before fitting nuts.
Step 4
Fit the top mark assembly to the tower. Fix to the tower shelf in 3 places using M10x16mm long bolts
and spring washers. Fix the post to the guard rail assembly using one 8mm x 40 U-Bolt, plain washers,
spring washers and nuts.
Step 5
Lift the buoy only using the lifting eyes on the mooring post deck.
Figure 6.
• DO NOT USE THE GUARD RAIL AS A LIFTING POINT
• DO NOT USE THE TOP MARK AS A LIFTING POINT.
• DO NOT USE THE LADDER AS A LIFTING POINT
• DO NOT USE SOLAR PANELS AS A LIFTING POINT.
• ONLY USE A SLING AROUND THE BODY OF THE TOWER
TO MOVE INTO POSITION