
4.3.
riveting pinS
4.3.1.
Loosen securing screw and reposition the pin holder body on the U holder in position B and re-tighten the securing screw (fig.4.3).
4.3.2.
Screw in the pin holder, ensuring that the riveting pin is positioned centrally onto one of the pin heads (fig.4.1).
4.3.3.
Use a 27mm spanner to hold the pin holder body and a 19mm spanner to turn the pin holder. Turn the pin holder clockwise and
start to push the riveting pin onto the pin. Keep checking to ensure that the riveting pin is centrally located on the pin and that it is
cleanly riveting it.
4.3.4.
The rivet should be clean, centred and deep enough, see fig.6.
4.3.5.
When the first pin has been riveted, undo the pin holder, re-position the chain so that the other pin is lined up with the riveting pin
and repeat the above procedure in 4.3.3.
5. Maintenance
5.1.
Clean the tools and lubricate threads before each use.
fig.5
fig.6
Original Language Version
© Jack Sealey limited
Sealey group, kempson Way, Suffolk business park, bury St edmunds, Suffolk. ip32 7ar
01284 757500
01284 703534
www.sealey.co.uk
environMent protection
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
note
: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior
notice.
important
: no liability is accepted for incorrect use of this product.
Warranty
: Guarantee is 12 months from purchase date, proof of which is required for any claim.
SMC4 Issue 1 15/11/19