Note:
The IR lamps are fragile and therefore it is important that the ML2751 is not subjected to any unnecessary shocks or vibration and is not
moved when the lamps are on.
p
WARNING!
Ensure that you read, understANd and apply the safety instructions in Section 1.
p
WARNING!
Ensure that the foam rubber lamp protectors have been removed before switching on.
4.1.
Allow a 4 - 5 minute flash-off period for excess solvent to evaporate before close positioning of lamp to panel - solvent boil or popping
may occur if panel temperature is raised too rapidly. Remove, or otherwise protect any trim items on, or adjacent to, the panel to prevent
possible distortion.
4.2.
Position the lamps approximately 500mm from the panel, ensuring that the knobs (7) have been firmly tightened when the desired
positions have been achieved.
4.3.
Paint-to-lamp distance and heating time are dependent on a number of factors including paint type and workshop conditions and are best
based on experience, however guidelines are as follows:
Note: Numbers in brackets refer to item numbers in fig. 1.
3.1.
Attach the stand (1) to base (2) using bolts, washers
and nuts provided (3).
3.2.
Fit the control unit support (4) onto the special pin (5)
welded onto the base.
3.3.
Fit the light fixtures (6) onto the stand, adjust to the
required height and secure in position using the
locking knob (7).
Note: The light fixtures have protective packaging which
should not be removed until they have been fitted
to the stand.
3.4.
Remove the adhesive tape (13) and the front grille (14).
3.5.
Remove the outer protective foam rubber packaging (16)
and carefully pull out the two internal foam rubber
protectors (18).
Note: GREAT CARE should be taken to avoid damaging
the heating element (17).
3.6.
Fit the front grille (14) and secure using the self
tapping screws provided (15).
3.7.
Connect the electrical plugs (9) to the lamp sockets (8).
3.8.
Connect the supply plug (10) to the mains supply.
4. OPERATION
3. ASSEMBLY
fig. 1
Important: Excessive drying time will burn the paint and may distort the panel.
4.4.
Set the required heating time on the timer(s), plug into the mains socket and switch on. The green warning light is illuminated when electrical power is
applied to the unit.
4.5.
When the heating period is over switch off at socket and then remove dryer plug.
4.6.
Allow lamps and lamp panels to cool before moving the dryer to a safe, dry, childproof storage area.
ML2751 - 2 - 250303
Material
Drying Time
Distance
Polyester stopper
8- 12mins
600 - 700mm
MS primer
15 - 18mins
500 - 600mm
Water-based filler paint 15 - 18mins
500 - 600mm
Finishing paint
18 - 25mins
400 - 500mm
5. DECLARATION OF CONFORMITY
Declaration of Conformity
We, the sole UK importer, declare that the product listed below is in conformity with the following standards and directives.
The construction file for this product is held by the Manufacturer and may be inspected, by a national authority, upon request to Jack Sealey Ltd.
For Jack Sealey Ltd. Sole UK importer of Sealey Power Products.
MEDIUM WAVE PANEL DRYER
Model: ML2751
73/23/EEC LV Directive
89/336/EEC EMC Directive
93/68/EEC CE Marking Directive
Signed by Mark Sweetman
26th March 2003
NOTE:
It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
IMPORTANT:
No liability is accepted for incorrect use of this equipment.
WARRANTY:
Guarantee is 12 months from purchase date, proof of which will be required for any claim.
INFORMATION:
For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.
Sole UK Distributor,
Sealey Group,
Bury St. Edmunds, Suffolk.
01284 757500
www.sealey.co.uk
01284 703534
Web