8
.6.5. Attach an end cap (64) to each end of the ridge beam using 16mm self tapping screws.
8.6.6. Now bolt the shed to the concrete base using the 11 base brackets supplied as shown above. Please note that
the anchor bolts are not supplied with the fixing kit. Where the mid wall channels on the inside of the shed meet
at the corners, strenghten them by applying a bracket (72) as shown above. Fix the keeper (71) to the inside of
the lower door frame ensuring that it is aligned with the barrel bolt.
Original Language Version
© Jack Sealey Limited
GSS3030G Issue: 1 - 28/08/14
Summary of Contents for GSS3030G
Page 3: ...Original Language Version Jack Sealey Limited GSS3030G Issue 1 28 08 14 ...
Page 4: ...Original Language Version Jack Sealey Limited GSS3030G Issue 1 28 08 14 ...
Page 5: ...Original Language Version Jack Sealey Limited GSS3030G Issue 1 28 08 14 ...
Page 6: ...Original Language Version Jack Sealey Limited GSS3030G Issue 1 28 08 14 ...
Page 7: ...7 PARTS DIAGRAM Original Language Version Jack Sealey Limited GSS3030G Issue 1 28 08 14 ...