Sole UK Distributor
Sealey Group
,
Bury St. Edmunds, Suffolk.
01284 757500
E-mail:
01284 703534
NOTE:
It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
IMPORTANT:
No liability is accepted for incorrect use of product.
WARRANTY:
Guarantee is 12 months from purchase date, proof of which will be required
for any claim.
INFORMATION:
For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.
3.2.
Attach the legs to the upright supports using the 38mm bolts (fig. 5.) ensuring that the latches are the correct way round (fig. 4.).
Fig. 4.
Latches to line up with locking studs
Fig. 5.
3.3.
Attach the horizontal struts (fig. 6.) to the legs using the 8 x 35mm cross head bolts (fig. 7.).
Fig. 6.
Fig. 7.
3.4.
Bolt the 2 x uprights to the 1 x platform bar using the 4 x 45mm bolts (fig. 8.).
3.5.
To complete assembly slide the platform bar assembly into the upright supports and insert the safety pins when platform bar is at the
desired height (fig. 9.).
Fig. 8.
Fig. 9.
3.6.
To prepare for storage, remove safety pins, lower platform bar and replace the pins, then release latches and fold legs in.
www.sealey.co.uk
Web
FDT3 - 1 - 260204