Sealey AP6500 Instructions Download Page 4

4.11   See Fig.13. 

now start to build the second low level unit by  

 

making up two end frames as shown in Fig.13. one short  

 

step beam (C) should be fixed at the top of the angle posts  

 

and the other short step beam (C) should be fixed at the 7th  

 

and 8th slots up from the bottom of the angle posts as  

 

shown below. Ensure that each step beam is facing upwards.  

 

Tap the beam at either end, close to each angle post to  

 

ensure that the tabs are seated at the bottom of the slots.

4.12  

See Fig.14. 

Join the two end frames together using the  

 

 

four remaining long step beams as shown below. Ensure  

 

 

that each step beam is facing upwards. Tap the beams at  

 

 

either end, close to each angle post to ensure that the tabs  

 

 

are seated at the bottom of the slots.

4.13   See Fig.15. 

Lay the shelves into position between the step  

 

beams as shown above.

01284 757500

01284 703534

[email protected]

Sole UK Distributor

Sealey Group,

Bury St. Edmunds, Suffolk.

www.sealey.co.uk

Web

email

4.10   HALF HEIGHT WORKSTATION.

 

See Fig.12. 

Follow steps 4.2 and 4.3 to create a bottom frame  

 

with four 'A' posts attached. using two long step beams (B)  

 

and two short step beams (C) insert a shelf support level at  

 

the top of the angle posts (A). Tap the beams at either end,  

 

close to each angle post to ensure that the tabs are seated in  

 

the slots. Insert another shelf support level at the desired height  

 

within the frame using additional long and short step beams  

 

and ensure that the tabs are seated in the slots.

Fig.12

Fig.13

Fig.15

Fig.14

Fig.16

AP6500   Issue: 1 - 05/06/09

4.14   See Fig.16.

 Place the two units end to end as shown below .

Reviews: