background image

5.  OPERATION

5.1. 

  

Prime unit by operating handle slowly until grease emerges from end of hydraulic connector (fig 1 - 7), (approx 20-25 operations).

 

‰

  

WARNING!

 

DO NOT

 allow uncontrolled discharge of grease thus polluting the environment.

5.2. 

  

When fully primed a slight resistance will be felt on the pump down stroke indicating the pump is ready for use.

6.  MAINTENANCE

 

  Before each use inspect the overall condition of the pump for broken, cracked or bent parts that may effect the proper operation.

A

K455.V2  Issue 1 01/02/21

Original Language Version

© Jack Sealey Limited

Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR

 01284 757500 

 01284 703534 

 [email protected] 

 www.sealey.co.uk

ENVIRONMENT PROTECTION

Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to 
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely 

unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids 

according to local regulations.

Note

: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior 

notice. 

Please note that other versions of this product are available. If you require documentation for alternative versions, please email or call 

our technical team on [email protected] or 01284 757505.

Important

: No Liability is accepted for incorrect use of this product.

Warranty

: Guarantee is 12 months from purchase date, proof of which is required for any claim.

   fig.2

   fig.1

Reviews: