![Seagull SEA53B Assembly Manual Download Page 6](http://html.mh-extra.com/html/seagull/sea53b/sea53b_assembly-manual_1223316006.webp)
YAK 54.
Instruction Manual.
6
1) Using a modeling knife, carefully cut
off the rear portion of one of the 3 nylon tubes
leaving 1/2” protruding from the rear of the
stopper. This will be the fuel pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line. Connect one end of the line
to the weighted fuel pick up and the other end
to the nylon pick up tube.
3) Carefully bend the second nylon tube
up at a 45º angle. This tube is the vent tube.
INSTALLING THE STOPPER ASSEMBLY.
ENGINE MOUNT.
See pictures below:
Mark and drill 4 holes for engine mount.
4x30mm.
Thread locker glue.
Diameter =5.5mm.
Rudder control horn.
Fuselage.
Fuselage.
Aluminum Washer
.
CONTROL HORN M3
M3 LOCK NUT
.
Aluminum Washer
.
M3 LOCK NUT
.
Aluminum Washer
.
M3 LOCK NUT
.
CONTROL HORN M3
20mm
.
Rudder.
Hinge.