![Seagull Models Boomerang 40 Assembly Manual Download Page 12](http://html.mh-extra.com/html/seagull-models/boomerang-40/boomerang-40_assembly-manual_1223348012.webp)
12
BOOMERANG 40.
Instruction Manual.
NOSE GEAR INSTALLATION.
TOOLS REQUIRED
3mm X 15mm.
1.5mm.
5. Bolt the engine to the engine mount
using the four machine screws. Double
cheek that all the screws are tight before
proceeding.
6
. Attach the Z-Bend in the pushrod wire
to the throttle arm on the carburetor. You will
need to remove the throttle arm from the car-
buretor to be able to attach the Z-bend. When
complete, reattach the throttle arm to the car-
buretor.
Pushrod wire.
1.5mm.
4. Remove the engine. Using an drill bit,
drill the mounting holes through the engine
mount at the four locations marked.