Attaching cables

Refer  to  Figure  1  on  page  6  and  Figure  2  on  page  7  for  the
locations of the connectors and jumper blocks.

1. Turn off the system power.

2. Put on a grounded wrist strap. 

3. Connecting a remote LED. Remote LED pins are located on

two separate jumper blocks: the options jumper block and the
user-configuration jumper block. Attach a two-pin remote LED
connector to either jumper block, as follows:

User-configuration jumper block: pins 9 and 10

Options jumper block: pins 7 and 8

4. Synchronizing drive spindles (disc arrays only). You can

synchronize the spindle motors of an array of drives by con-
necting  a  twisted  pair  to  each  drive.  The  maximum  cable
length is 6 feet (1.8 meters).

Spindle  synchronization  pins  are  located  on  two  separate
jumper blocks—the options jumper block and the user-con-
figuration jumper block. Use either jumper block to synchro-
nize an array of drives, as follows:

User-configuration jumper block. Use one strand of the
twisted pair to connect together pin 7 of the user-configura-
tion  jumper  block  of  each  drive.  Use  the  other  strand  to
connect  together  pin  8  of  the  user-configuration  jumper
block of each drive. 

Options jumper block. Use one strand of the twisted pair
to connect together pin 5 of the options jumper block of each
drive. Use the other strand to connect together pin 6 of the
options jumper block of each drive.

5. Attaching the power cable. Attach a system power cable to

the drive power connector.

ST3390N, ST3655N Installation Guide, Rev. A

5

Summary of Contents for ST3390N

Page 1: ...ST3390N ST3655N SCSI Interface Drive Installation Guide...

Page 2: ...trademarks of their owners Seagate reserves the right to change without notice product offerings or specifications No part of this publication may be reproduced in any form without written permission...

Page 3: ...eted areas Drive handling The drive is extremely fragile handle it with care Do not attach labels to any part of the drive Inspection Once you are familiar with the handling precautions listed above i...

Page 4: ...an der Unterseite nicht mehr als 5 08 mm betragen 3 Als Versorgungsspannugen werden ben tigt 5V 5 0 5A 12V 5 0 5A 1 9A fur ca 30 Sek fur 10 4 Die Versorgungsspannung mu SELV entsprechen 5 Alle Arbeite...

Page 5: ...and 4 of the terminator power source jumper block does not disconnect the terminating resistors from the circuit If your application requires no terminatingresistors you must unplugthem from the drive...

Page 6: ...ed in the following table Fast SCSI SCSI Termination Active Active or passive Terminator specification 110 ohms 110 ohms or 220 330 ohms Install active passive termination jumpers Pins 1 and 2 Pins 1...

Page 7: ...e maximum cable length is 6 feet 1 8 meters Spindle synchronization pins are located on two separate jumper blocks the options jumper block and the user con figuration jumper block Use either jumper b...

Page 8: ...ound Signal 6 5 J9 Active passive termination jumper block Circuit board 2 85V to 110 ohms 3 4 1 2 5 6 LSB Terminating resistor packs pin 1 Circuit board Power and ground to 220 330 ohms J6 Terminator...

Page 9: ...ground Remote LED Remote LED Reserved Do not use Pin 17 18 15 16 19 20 J12 Options jumper block 7 8 5 6 3 4 1 2 Circuit board Pin Function 1 Ground 2 Parity enable 3 Ground 4 Remote start enable 5 Cl...

Page 10: ...drive You can mount the drive in any orientation Follow the guidelines below for either bottom mounting or side mounting Figure 3 shows the recommended mounting orientations and the optimum placement...

Page 11: ...Interface connector Power connector Figure 3 Recommended mounting orientations ST3390N ST3655N Installation Guide Rev A 9...

Page 12: ...set to zero or the no hard drive installed option Physical geometry for non DOS operating systems When installing the drive in non DOS operating systems use the following information to configure you...

Page 13: ...using you need to prepare the drive by writing partitioninginformation on it After you have configured the drive and defined it in the CMOS boot the system from the diskette drive with a bootable DOS...

Page 14: ...cards Verify compatibility Reread the documentation for the host adapter and the drive to confirm that these components are appropriately matched to each other and to your computer Verify your configu...

Page 15: ...ction jumper Assuming you have configured the host adapter correctly and a memory conflict exists the problem might be that the host adapter is trying to use the same BIOS memory address as another pe...

Page 16: ...ngs and the active passive termination jumper settings described on pages 3 and 4 respectively Check the power supply specifications Reboot and make sure the drive spins up It may be difficult to hear...

Page 17: ...reboot the host adapter may be incompatible or defective See your dealer The system hangs in FDISK or fails to create or save the partition record Check all cables The DOS utilities diskette may be c...

Page 18: ...ays consult your system dealer first for technical support Dealers are generally more familiar with unique system configu rations Technical support is available for all Seagate products by calling the...

Page 19: ...e Request a return phone call from the technical support staff SeaBoard is available 24 hours daily It supports communica tions up to 9600 baud Set your communications software to eightdata bits no pa...

Page 20: ...Seagate Technology Inc 920 Disc Drive Scotts Valley CA 95066 USA Publication Number 36235 001 Rev A Printed in USA...

Reviews: