2) Mounting of the spring
Insert the spring in to the carter as shown in Fig.5.
Lubrication
with grease
during mounting
Fig. 5
3) Mounting plate fixing
- Dig a hole 31,5x24x16 inches
- Widen the foundation plate clamps at 60° (Fig. 6)
- Fill the hole with R425 concrete and place the foundation plate
as in Fig. 6.
- Level the plate with care.
* The plate has got a central hole for electric wiring so before
filling the hole with concrete put an elettric wire sheathing on the
hole.
Concrete
Fondation plate
to be levelled
Wire sheathing
Clamps 60°
~
Fig. 6
1
6
31,5
117 (Vela Ind. Series)
International registered trademark n. 2.777.971
SEA USA Inc.
10850 N.W. 21st unit 160 DORAL MIAMI
Florida (FL) 33172
Phone:++1-305.594.1151
Fax: ++1-305.594.7325
Toll Free: 800.689.4716
67410268
7
Rev. 01 - 11/2010