ST88-21 C/Ku-Band TVRO
Installation
3-3
3.4.1.
Location of Items inside the Crates
New packing lists for the crates make it easier to locate and unpack the items that are needed to assemble
and install the Antenna System. Crate design make it easier to unpack the items from each crate. All bolts,
mounting the equipment in the crate can be removed from the top side.
There is no longer any need to
reach under the pallet to hold nuts while the bolts are being removed!
,
3.4.2.
Base Frame and Reflector Crate
We recommend that you place the Base Frame and Reflector Crate in the area that you have chosen to
assembly each of these major components.
1.
This is the Base Frame & Reflector
crate.
2.
Remove the outer frame (top and
sides of the crate) by removing the
lag bolts (3/4” socket) around the
bottom of that secure the outer
frame to the bottom section of the
crate and lift the outer frame off.
3.
Remove the plastic covering.
4.
Feed Struts (wrapped and tied to
the wooden diagonal).
5.
Feed Assembly and LNB Box
(Contains: Feed Assembly, LNB,
Feed Flex Waveguide and Coaxial
Cables).
Summary of Contents for ST88-21 C/Ku-Band TVRO
Page 4: ......
Page 10: ...Table of Contents x This Page Intentionally Left Blank ...
Page 14: ...Introduction ST88 21 C Ku Band TVRO 1 4 This Page Intentionally Left Blank ...
Page 22: ...Site Survey ST88 21 C Ku Band TVRO 2 8 This Page Intentionally Left Blank ...
Page 56: ...Installation ST88 21 C Ku Band TVRO 3 34 This Page Intentionally Left Blank ...
Page 60: ...Setup Ships Gyro Compass ST88 21 C Ku Band TVRO 5 2 This Page Intentionally Left Blank ...
Page 68: ...Setup Home Flag Offset ST88 21 C Ku Band TVRO 7 4 This Page Intentionally Left Blank ...
Page 76: ...Setup Searching ST88 21 C Ku Band TVRO 9 6 This Page Intentionally Left Blank ...
Page 120: ...Model ST88 21 Drawings ST88 21 C Ku Band TVRO 15 2 This Page Intentionally Left Blank ...
Page 125: ......
Page 128: ......
Page 137: ......
Page 141: ......
Page 142: ......
Page 143: ......