Section 03 ELECTRONIC MANAGEMENT SYSTEMS
Subsection 03 (COMMUNICATION TOOLS AND B.U.D.S. SOFTWARE)
COMMUNICATION TOOLS AND
B.U.D.S. SOFTWARE
SERVICE TOOLS
Description
Part Number
Page
MPI-2 DIAGNOSTIC CABLE..........................................................
710 000 851 ......................................... 182
MPI-2 INTERFACE CARD ..............................................................
529 036 018 ......................................... 182
SERVICE TOOLS – OTHER SUPPLIER
Description
Part Number
Page
MALE-FEMALE EXTENSION SERIAL CABLE...............................
......................................... 182
GENERAL
Refer to
PROCEDURES
for instructions on the
communication tools.
If communication problems occurs, refer to
TROUBLESHOOTING
.
NOTE:
Never use the D.E.S.S. POST INTERFACE.
529036019_a
TROUBLESHOOTING
DIAGNOSTIC TIPS
IMPORTANT:
Make sure all connections have
been made
before starting B.U.D.S.
to allow
proper operation.
MPI-2 Connection Troubleshooting
MPI-2 Status Lights
The MPI-2 includes 2 status lights to show the
connection conditions: USB and CAN.
Both lights
must be GREEN
so that MPI-2 works properly.
Otherwise, refer to the following charts.
vdd2006-001-151_b
Prerequisite for USB communication:
– PC Computer turned on.
– MPI-2 connected to PC computer.
USB LIGHT
STATUS
WHAT TO DO
Light is
OFF
Check USB connection between
MPI-2 and PC computer.
Check USB operation on PC computer
(hardware or Windows drivers).
Light is
GREEN
Connections are GOOD. Communication
can take place on USB side.
Prerequisite for CAN communication:
– MPI-2 connected to diagnostic connector of ve-
hicle.
– ECM turned on (press the START button).
– D.E.S.S. key installed on D.E.S.S. post of vehi-
cle.
– B.U.D.S. started and logged.
smr2009-028
179
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...