14
4.1
maSonry BricK inStallation
step 1: base
lay a masonry base, minimum 75mm thick (ie. solid bricks).
the base should be laid on a adequate ground supporting it’s
weight.
**important**
if using the optional outdoor air kit please leave a 125mm air
gap behind the firebox. Refer to Step 6: Outdoor Air Kit.
step 2: baCk wall
Using masonry brick, construct the back wall from the base to
the top of the ceiling.
step 3: sheet metal layer
(optional step)
place a thin piece of sheet metal on top of the bricks in order to
level the base and safely manoeuvre the firebox.
allow a minimum of 100mm on all sides.