18
EN
After installing and test, place a transparent
acid free silicone seal at the top and on the
sides of the door station (not at the bottom)
to avoid any risk of infiltration.
7
C2- Wiring diagram
Outdoor station
Indoor monitor
Additional
monitor 1
Additional
monitor 2
Connect the shield
if the cable is shielded
+
-
12V DC - 700mA
1
1
1
1
2
0 - 50 m - 0,75 mm2
50 - 100 m - 1 mm2
2
2
2
A
A
A
LK+
B
S
B
B
S
S
LK-
SW1
SW2
Polarity free
100 m maximum - 1 mm2
The monitor can take up to 15 seconds to turn on.
Do not operate the door station until the home screen appears on the monitor.
You can directly connect
the monitor to your
electrical panel via a 15V
DC 0,8A (minimum)
«rail DIN» transformer.
Electrical knowledges are
necessary, in this case we
advise you to contact a
professional.
Summary of Contents for OpenGate 3
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......