4” - 6”
4” - 6”
INSTALLATION
- NANO BOX -
110v AC - RTS
1. Install the wall brackets 4 - 6 inches in from the end of the shade with the supplied screws.
(The closer to the end of the cassette, the better)
2. Make sure the wall bracket lever is down (may already be down).
3. Push power cable into pre-wire hole
Installation - Nano Box -110v AC - RTS
3
Note:
Motor cable is not plenum
rated. Terminate accordingly.
Proper position for installing Box
Summary of Contents for Nano 375 Box
Page 2: ......
Page 9: ...NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 7 Notes ...
Page 10: ...8 ...