![Screen Excellence TAM 2L Installer'S Instructions Download Page 6](http://html1.mh-extra.com/html/screen-excellence/tam-2l/tam-2l_installers-instructions_1219605006.webp)
19.Once the masks movements are satisfying, you are ready to assemble the
whole screen together. Match colour tags of subframe with mainframe.
Watch the position of the screws
20.Place the finishing boards at the outer edges
21.Determine the position of the wall screws (size ¼”). Refer to drawing.
Install 4 wall screws at the correct distance, leaving the screw heads
protruding by about 2/12”
If further spacing off the wall is needed, use 4 optional spacing brackets.
22.Fix the whole screen on the 4 screw heads. Then you’re ready to test the
different positions
6