After Utility Connections
1. Wash out the bin. If desired, the interior of the
bin could be sanitized.
2. Locate the ice scoop (if supplied) and have it
available for use when needed.
3. Switch on the electrical power. Do not start the
machine for 4 hours.
4. Go thru the final check list (below).
Final Check List:
___ 1.
Is the unit located indoors in a controlled
environment?
___ 2.
Has the correct remote condenser been
properly located and mounted?
___ 3.
Has the correct electrical power (voltage
and phase) been supplied to the
machine?
___ 4.
Have all the water supply connections
been properly made with the correct size
tubing?
___ 5.
Have all the drain connections been
properly made?
___ 6.
Has the unit been leveled? Level the unit
at the bin.
___ 7.
Have all unpacking materials been
removed?
___ 8.
Is the water pressure adequate?
___ 9.
Is the machine secured to the ice storage
bin?
___ 10. Is the bin control system been properly
installed?
___ 11. Have the drain connections been checked
for leaks?
___ 12. Has the bin interior been wiped clean or
sanitized?
___ 13. Have any water filter cartridges been
replaced?
___ 14. Check all refrigerant lines and conduit
lines, for vibration or rubbing and possible
failure. Adjust as needed.
___ 15. After 4 hours of electrical power, proceed
to Initial Start Up.
CME1356R and CME1656R
May 2001
Page 16