background image

  

   

Shenzhen SCOTLE Technology

 

----------------------------------------------------------------------- 

Email:[email protected]    Tel:86075589378931   

http://www.scotle.com/

 

------------------------------------------------------------------------------------------------ 

contact with the object , because it may cause fire or explosion ,and the 
PCB work piece should be placed on the PCB support shelves.   

 
3. Do not shake BGA rework station, and move gently. 
 
4. Do not touch the high fever area to avoid get burned.   
 
5. When turned on, do not use the flammable spray, liquid or flammable gas 

near the repair station.   

 
6. Do not try to modify BGA rework station when in power , otherwise it will 

cause fire or electric shock.   

 
7.  Electrical  box  has  the  high-voltage  components,  do  not  attempt  to 

disassemble it.   

 
8.  If  the  metal  objects  or  liquids  fall  into  the  repair  station  when  it  works  , 

immediately  disconnect  the  power  ,  unplug  the  power  cord  until  the 
machine  to  cool  down  ,  then  completely  remove  litter  ,  dirt  ;  if  dirt 
left ,there is odor when reboot. 

 
9. When abnormal heating or smoking immediately disconnect the power , and 

inform  the  technical  service  to  repair.  It  needs  to  disconnect  the  wires 
between the electrical boxes and machine parts, and have to hold the plug, 
otherwise it leads to poor contact ,and does not work.   

 
10.  Note  that  the  repair  station  not  to  press  or  run  over  other  electrical 

equipment  or  power  lines  or  communication  cable  ,  and  it  may  cause 
device malfunction or cause fire or electric shock. 

 

Scotle HR460C touch screen use:

 

  Operation steps: 

1.

 

Power on to turn on the SCOTE HR460C BGA rework station 

Summary of Contents for Scotle-HR460C

Page 1: ...http www scotle com SCOTLE BGA Rework Station Model Scotle HR460C Scotle HR460C BGA rework station power requirement Use a smaller power supply voltage fluctuation Voltage fluctuations 220V 10 Freque...

Page 2: ...le Adjust the upper zone of before and after position Rotating the handle 4 7 handle lock the rotation angle of the upper zone Rotating the handle 5 Head light Lighting equipment at work Press the but...

Page 3: ...zone BGA rework with warm up 17 Temperature Interface Connect an external galvanic measure the actual temperature Directly connect temperature line 18 Touch screen Data storage system platform Scotle...

Page 4: ...igh precise K type closed loop control and automatic temperature adjustment system Together with PLC and temperature module users can control the temperature efficiently and can keep the temperature d...

Page 5: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com...

Page 6: ...l 86075589378931 http www scotle com 6 Scotle HR460C uses movable and retractable universal fixture which can protect PCBA from deformation and avoid damaging the surrounding components from And it is...

Page 7: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com...

Page 8: ...is equipped with different kinds of alloy air nozzles which can be rotate in 360 degrees for easy positioning and they can be installed and replaced easily 8 Scotle HR460C has three independent temper...

Page 9: ...the touch screen 11 Scotle HR460C applies high power cross flow fan cooling system uses which can cooling the PCB quickly to avoid deformation Scotle HR460C is with built in vacuum pump and external v...

Page 10: ...hen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com 14 Scotle HR460C is equipped with emergency stop button and automatic power off device which can make sure safety wo...

Page 11: ...LE Technology Email sales scotle com Tel 86075589378931 http www scotle com 15 Scotle HR460C use drawer design repair window if users need to check or repair the machine just draw the repair panel out...

Page 12: ...ell ventilated dry place 4 Stable flat areas less susceptible to vibration 5 Clean with less dust room 6 No placing heavy objects on top of the control box 7 Without the affect of air conditioners hea...

Page 13: ...t 8 If the metal objects or liquids fall into the repair station when it works immediately disconnect the power unplug the power cord until the machine to cool down then completely remove litter dirt...

Page 14: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com 2 The touch screen shows interface as below you can select your target language...

Page 15: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com...

Page 16: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com 3 Choose English turn up below interface...

Page 17: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com 4 After input password below interface shows...

Page 18: ...ature zones can be set 6 ramp up temperature segments and 6 constant temperature segments You can certify the temperature parameters in the current interface and it only can be run one time after you...

Page 19: ...com Tel 86075589378931 http www scotle com 7 Users can certify and save the parameters according to their own different needs SCOLTE HR460C can store massive profiles and users can select any one to...

Page 20: ...com How to select profile Click to enter into below interface Touch to enter below interface and select the temperature number then to finish the selection to main interface to and run the selected pr...

Page 21: ...ttp www scotle com You can change the current parameters to your own setting as below After certify the parameter touch After certifying all the parameters of the three temperature zones then to store...

Page 22: ...g the top target parameters are all ran or the top ramp up slope is 0 then the heating process is finished and the machine stop running and begin buzzle If the cooling system and vacuum system already...

Page 23: ...more than 300 degrees the machine will stop heating immediately 12 The rework system can automatically set the alarming time in advance If set 10s the machine will buzz 10s before the heating process...

Page 24: ...90 215 225 230 0 Constant time 30 30 35 40 70 0 IR pre heater 110 120 130 140 150 0 Constant time 30 30 35 40 70 0 Slope rate 2 2 2 2 2 0 Preheating Constant Ramp up Soldering 1 Soldering 2 Cooling Up...

Page 25: ...t time 30 30 35 40 70 0 Slope rate 2 2 2 2 2 0 Preheating Constant Ramp up Soldering 1 Soldering 2 Cooling Up heater 165 190 225 245 255 240 Constant time 30 30 35 55 25 15 Bottom heater 165 190 225 2...

Page 26: ...ature profile The maximum of each temperature segment cannot exceed 300 If it is lead free soldering users can set temperature profile according to the BGA solder ball soldering temperature 3 When to...

Page 27: ...d and the hot air nozzles blow cold wind now Move the top heater up to make sure the hot air nozzle is 3 5mm away from the BGA surface and after getting cooling for 30 to 40 seconds or the Start butto...

Reviews:

Related manuals for Scotle-HR460C