SUMMARY 

!

/

"

 

Sufficient space for unit installation 

 

Hot and cold water feeds are installed 

 

Drain pipes are prepared 

 

Electrical requirements are met 

 

Cabinetry/floors can withstand operation of the unit 

 

Water quality is acceptable 

 

Internet connection installed 

 

HIP/HIP Ultra cleaning solution ordered 

 

Compressed air connection (HYDR

IM

 C61wd G4 LCS model ONLY) 

 

 
Follow-up Comments: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for HYDRIM G4

Page 1: ...oes not compromise the function of the unit in any way Prior to installation it is important that the site be inspected and all the appropriate conditions are met to ensure the safe and efficient oper...

Page 2: ...ounter it is recommended to allow at least 10 mm space at the top and both sides of the unit This will facilitate installation levelling and service access to the HYDRIM Note 2 Avoid installing the HY...

Page 3: ...cold water feed valve so that both machine pipes can be connected to the cold supply The machine will not work with only one supply attached as it requires pressure in both supplies to activate the f...

Page 4: ...o Sealed edges o Heat resistance o Sound structural integrity o Post installation access o Flatness See note 3 above Water Quality The quality of the water being used in the HYDRIM to clean the medica...

Page 5: ...ort Note 1 The port should be installed in a cabinet adjacent to the unit Note 2 Ensure that the port has access to the office network and the internet Note 3 Although the unit can be connected to a b...

Page 6: ...ls D13 12A 200 230 V 50 Hz 1 50 m 5 ft 2 7 kW D01 12A 230 240 V 60 Hz 1 50 m 5 ft 2 5 kW D03 13A 230 240 V 60 Hz 1 50 m 5 ft 2 5 kW D02 13A 230 240 V 50 Hz 1 50 m 5 ft 2 5 kW D04 13A 230 240 V 50 Hz 1...

Page 7: ...feeds are installed Drain pipes are prepared Electrical requirements are met Cabinetry floors can withstand operation of the unit Water quality is acceptable Internet connection installed HIP HIP Ult...

Page 8: ...for drying Total water consumption per cycle with drying P1 P2 11 4 L 1 5 L P3 30 3 L 2 5 L Maximum heat transmitted through fascia 1200 W Water softener salt capacity 0 5 kg 1 1 lbs Equipment instal...

Page 9: ...nge 6 8 and 8 5 Water volume per process stage 8 L 1 L P3 has additional 8 1L for drying Total water consumption per cycle with drying P1 16 L 2 L P2 32 L 4 L P3 40 L 5 L Maximum heat transmitted thro...