
Page 6
15.
Once “4iiii” is selected the console will enter
the pairing process, check the side of the
power sensor for a 4 OR* 5-digit ANT+ ID
code. Enter this code on the “ENTER ANT
ID” screen using AVG/MAX to scroll and the
back-light
to enter the ANT+ ID.
Fig. 12
Fig. 13
Please note that the ANT+ ID referenced
in Step 4 could be either a 4-digit OR 5-digit
number.
If the 4-digit code is present, the fi rst number
of the ANT+ ID Code is zero (0).
16.
Once the ANT+ ID has been entered, pedal
the bike, then select “PAIRING SPIN CRANK”
but pushing the back-light button
. If
pairing does not pass, check to ensure the
ANT+ ID is correct and try the pairing process
again. It may take 2-3 attempts to pair
successfully.
17.
After successfully pairing the 4iiii crank, the
power sensor must be calibrated BEFORE
riding the bike. Press and hold STAGE
and AVG/MAX for 3-5 seconds to access
the service menu then use AVG/MAX to
scroll until “CALIBRATE” is displayed
then select it using the back-light button
. “ZERO RESET” will be displayed,
press the back-light button
to select it.
Once “SPINCRANK” is displayed, spin the
crank and press the back-light button
to proceed. Ensure that the left crank arm
is in the 6 o’clock position then follow the
on-screen directions to fi nish calibrating the
sensor.