H.7
Date Code 20170601
Instruction Manual
SEL-387-0, -5, -6 Relay
Protection Application Examples
Transformer Winding and CT Connection Compensation Settings Examples
Figure H.7
Non-Standard System Phase-to-Transformer Bushing Connections
Assume balanced X-side (wye-winding) three-phase currents Ia, Ib, and Ic.
Kirchhoff’s Current Law is used at each H-node to determine the primary
phase currents on the H-side of the system:
IA = Ia – Ic
IB = Ib – Ia
IC = Ic – Ib
shows that system primary current Ia (X-side) leads the system
primary current IA (H-side) by 30 degrees.
Figure H.8
X- and H-Side Current Phasors for Figure H.7
The primary load phase shift determined in
applies for the
phase-to-bushing connections shown in
. In each of these
phase-to-bushing connections, the order of the phase connections (A, C, B) is
opposite the order of the bushings (H1, H2, H3).
The system phase-to-transformer bushing connection diagrams in
and
are on the same transformer, but with a different order of the
phases connected to the transformer bushings. As a result, the X-side primary
current shifts 30 degrees in opposite directions in the two systems.
A (H3)
B (H2)
C (H1)
Winding 1
Winding 2
A
B
C
a
b
c
H3
H2
H1
X3
X2
X1
b (X2)
a (X3)
c (X1)
IA
IB
IC
Ia/N
Ib/N
Ic/N
Ia
Ib
Ic
Table H.3
(A, C, B) to (H1, H2, H3) Phase-to-Bushing Connections
Bushing
H1
H2
H3
X1
X2
X3
System
Phase
C
B
A
c
b
a
B
A
C
b
a
c
A
C
B
a
c
b
Ic
Ib
Ia
IC
IB
IA
–Ic
IA = Ia–Ic
Ia
X-Side Currents
H-Side Currents
Summary of Contents for SEL-387-0
Page 6: ...This page intentionally left blank ...
Page 12: ...This page intentionally left blank ...
Page 50: ...This page intentionally left blank ...
Page 200: ...This page intentionally left blank ...
Page 248: ...This page intentionally left blank ...
Page 380: ...This page intentionally left blank ...
Page 422: ...This page intentionally left blank ...
Page 440: ...This page intentionally left blank ...
Page 458: ...This page intentionally left blank ...
Page 516: ...This page intentionally left blank ...