10.8
SEL-787 Relay
Instruction Manual
Date Code 20081022
Testing and Troubleshooting
Commissioning Tests
Step 5. Repeat
through
using
and
.
Figure 10.5
CTR2 Current Source Connections
Power and Power Factor Measuring Accuracy
Wye-Connected Voltages
Perform the following steps to test wye-connected voltages:
Step 1. Connect the current source to the relay, as shown in
(VIWDG = 1) or
(VIWDG = 2).
Step 2. Connect the voltage source to the relay, as shown in
. Make sure that DELTA_Y := WYE.
Table 10.3
CTR1 Phase Current Measuring Accuracy
|I| Applied
(A secondary)
a
a
I
NOM
= rated secondary amps (1 or 5).
Expected
Reading
CTR1 x |I|
A–Phase
Reading
(A primary)
B–Phase
Reading
(A primary)
C–Phase
Reading
(A primary)
0.2 x I
NOM
0.9 x I
NOM
1.6 x I
NOM
Table 10.4
CTR2 Phase Current Measuring Accuracy
|I| Applied
(A secondary)
a
a
I
NOM
= rated secondary amps (1 or 5).
Expected
Reading
CTR2 x |I|
A–Phase
Reading
(A primary)
B–Phase
Reading
(A primary)
C–Phase
Reading
(A primary)
0.2 x I
NOM
0.9 x I
NOM
1.6 x I
NOM
SEL-787
Current
Test
Source
IA
IB
IC
IC
IB
IA
IN
Z07
Z08
Z09
Z010
Z011
Z012
Summary of Contents for SEL-787
Page 1: ...20081022 SEL 787 Transformer Protection Relay Instruction Manual PM787 01 NB ...
Page 6: ...This page intentionally left blank ...
Page 12: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 78: ...This page intentionally left blank ...
Page 206: ...This page intentionally left blank ...
Page 280: ...This page intentionally left blank ...
Page 334: ...This page intentionally left blank ...
Page 376: ...This page intentionally left blank ...
Page 388: ...This page intentionally left blank ...
Page 474: ...This page intentionally left blank ...
Page 508: ...This page intentionally left blank ...