![SCHUNK SRM 10 Assembly And Operating Manual Download Page 111](http://html.mh-extra.com/html/schunk/srm-10/srm-10_assembly-and-operating-manual_1216055111.webp)
Maintenance, size 16 - 40
10 Maintenance, size 16 - 40
WARNING
Risk of injury due to unexpected movements!
If the power supply is switched on or residual energy remains in
the system, components can move unexpectedly and cause
serious injuries.
•
Before starting any work on the product: Switch off the power
supply and secure against restarting.
•
Make sure, that no residual energy remains in the system.
10.1 Maintenance interval
CAUTION
Material damage due to hardening lubricants!
Lubricants harden more quickly at temperatures above 60°C,
leading to possible product damage.
•
Reduce the lubricant intervals accordingly.
Interval
(million cycles)
for SRM
Maintenance work
16
20
25
32
40
daily
Visually inspect the function of the
shock absorbers,
2
2
2
1.3 1.3 Check that the shock absorbers are
working, if necessary replace shock
absorber,
2 /
1.5
(MDF)
2
2
1.3 1.3 Clean all parts thoroughly, check for
tightness, replace seals if necessary,
2
2
2
2
2 Treat all grease areas with lubricant,
111
12.00 | SRM | Assembly and Operating Manual | en | 1346850
Summary of Contents for SRM 10
Page 135: ......