
Handling, Installation, Storage and Transportation
16
02.00 | FDB-AC | Assembly and Operating Manual | en | 389513
4 Handling, Installation, Storage and Transportation
4.1 Inspection of Condition when Delivered
Upon receipt, the following must be checked:
• Delivery in accordance with freight documents
• Damage to packaging
If there is damage to any of the packaging, or if any of the goods
have been exposed to abnormal handling, unpack those parts that
may have been damaged for a closer inspection. If necessary,
notify SCHUNK for assistance in evaluation of the product
condition.
4.2 Unpacking and Handling
The FDB-AC tool, during transportation, storing and handling,
should always be placed inside the accompanying box (crate).