background image

SCHOTTEL 
 

SRP 15 .... SRP 300 

 

No. 
BA 103 E 
 

 

Dat. 
1-12-77 
 

TD-NM-in 
 

Seitenz. 
19 
 

Seite 

 

 

 

SCHOTTEL - RUDDER PROPELLER 

 

"SRP" 

 

OPERATING INSTRUCTIONS 

 
 
   Section                                                        Page 
 
     1     DESCRIPTION                                            2 
     1.1   General                                                2 
     1.2   Design                                                 2 
           Fig. 1  Cross-sectional View                           3 
     1.3   Lubrication                                            4 
     1.4   Compensating Fin                                       4 
     1.5   Steering Worm Gears                                    4 
     2     OPERATION                                              6 
     2.1   Measures to be taken when Operating a New              6 
           or Repaired SRP 
     2.2   Regular Checks prior to Start-up                       6 
           Table of the Oil Quantities                            7 
     2.3   Checks during Operation                                8 
     2.4   Swinging out the SRP                                   8 
     3     MAINTENANCE                                            8 
     3.1   Maintenance Schedule                                   8 
     3.2   SRP Gear-box Oil Change                               10 
     3.3   Attached Steering Gearing Oil Change                  10 
     3.4   Checks on the Lower Gearing                           12 
     3.5   Measures to be Taken for Taking an                    12 
           SRP out of Operation for up to 6 Months 
     3.6   Setting the Compensating Fin                          12 
     3.7   Air Filter Cleaning                                   14 
     3.8   Rudder Position Indicator Adjustment                  14 
     4     INSTALLATION                                          14 
     4.1   Schottel Navigator Installation                       14 
     4.2   Installation of the SRP in the Well                   14 
     4.3   Propeller Installation                                16 
 
           RECOMMENDED LUBRICANTS                                19 
 
 

Summary of Contents for SRP 100

Page 1: ...t up 6 Table of the Oil Quantities 7 2 3 Checks during Operation 8 2 4 Swinging out the SRP 8 3 MAINTENANCE 8 3 1 Maintenance Schedule 8 3 2 SRP Gear box Oil Change 10 3 3 Attached Steering Gearing Oi...

Page 2: ...through such a pair of bevel gears All bevel gears have been hardened and lapped in pairs The lower gearing with associated screws and gaskets is made of corrosion resistant material 1 2 DESIGN Legend...

Page 3: ...SCHOTTEL SRP 15 SRP 300 No BA 103 E Dat 1 12 77 TD NM in Seitenz 19 Seite 3 Figure 1 Cross sectional View...

Page 4: ...igure 1 2 on the oil tank and an electric warning switch Figure 1 6 are provided for checking the oil level the warning switch closes a contact as soon as the specified oil quantity is fallen below Th...

Page 5: ...rm Gear Design for Navigator Design for Well Installation Plug screw with dipstick Hydraulic motor Rudder position transmitter Worm gear Magnetic plug oil drain plug Second oil drain plug Oil level si...

Page 6: ...RP or after an oil change because replenishing may become necessary due to possibly existing air traps The required oil quantities are specified in the table on page 7 these data however are only refe...

Page 7: ...54 5 99 113 2100 14 22 5 27 39 56 102 116 2200 14 5 23 28 33 58 1O6 119 2300 24 29 34 59 5 109 122 2400 25 30 34 5 61 112 126 2500 26 31 35 5 63 115 129 2600 27 32 36 5 64 5 113 132 2700 27 5 33 37 66...

Page 8: ...Note Close the vent cock on the attached oil tank Figure 1 1 see section 3 8 3 MAINTENANCE 3 1 MAINTENANCE After 50 Operating Hours on a New SRP Check the mounting screws of the lower section Figure 7...

Page 9: ...SCHOTTEL SRP 15 SRP 300 No BA 103 E Dat 1 12 77 TD NM in Seitenz 19 Seite 9 Figure 3 oil suction pump SRP Well Installation...

Page 10: ...e g for well installations remove the oil warning switch Figure 1 6 Then pull out the plug Figure 1 7 on SRP s up to SRP 100 by means of an M 10 threaded rod Pass the hose 18 mm outside diameter maxim...

Page 11: ...SCHOTTEL SRP 15 SRP 300 No BA 103 E Dat 1 12 77 TD NM in Seitenz 19 Seite 11 Figure 4 Figure 5 Figure 6...

Page 12: ...rity of attachment retighten if required For torque loads see page 13 3 5 MEASURES TO BE TAKEN FOR TAKING AN SRP OUT OF OPERATION FOR UP TO 6 MONTHS If an SRP is taken out of operation or removed due...

Page 13: ...e Torque SRP Type Thread size Wrench Size mm Nm mkp A M 10 17 37 3 8 30 15 B M 12 19 65 6 6 30 31 A B M 12 19 65 6 6 50 50 50 51 A B M 12 19 65 6 6 A M 14 22 114 11 6 76 75 76 76 B M 16 24 177 18 1 A...

Page 14: ...eler pin Figure 7 1 is provided at the upper gearing which when pushed in by hand is engaged with a groove at the straight ahead position After the rudder position indicator has been adjusted pull out...

Page 15: ...NM in Seitenz 19 Seite 15 Figure 7 Installation of the SRP in the Well 1 Feeler pin 2 Hexagon nut 3 Steering pipe flange 4 Rubber gasket 5 Well foundation 6 Power transmission shaft 7 Worm 8 Connecti...

Page 16: ...ecure seating by the clamping sleeve When installing a new propeller spare propeller apply dye check paint onto the taper of the propeller shaft provisionally fit the propeller and check the wear patt...

Page 17: ...SCHOTTEL SRP 15 SRP 300 No BA 103 E Dat 1 12 77 TD NM in Seitenz 19 Seite 17 Figure 8 figure 9...

Page 18: ...size Mm mkp M 8 13 27 5 2 8 M 10 17 52 5 3 M 12 19 88 3 9 Lock the screws Figure 9 2 by means of locking wire 1 5 mm diameter Fit the propeller cap Figure 9 4 checking the sealing ring Figure 9 6 for...

Page 19: ...rgol GR XP 460 ISO Non Leaded Gear Compound 68 Non Leaded Gear Compound 46C Spartan EP 68 Spartan EP 46O Giran 68 ISO Pontonic N 80 Dilano 20 W 20 Giran 460 ISO Mobilgear 626 Mobilube GX 8O Mobilgear...

Reviews: