
8.2
Installation of units with rotatable element
Page 9 of 17
Created on 23.07.2020
en
8.2.
Installation of units with rotatable element
The position of the cable bushing can be adapted.
To do this, loosen the threaded pins, but do not unscrew them completely.
However, the connection head may only be rotated a maximum of 45° to the
right or left.
10.
For units with an external adjustment, pull off the scale lever.
11.
Loosen the 2 countersunk screws on the front
12.
Remove the hood.
13.
Make sure that the earthing cable has not become detached.
Max. tensile load of the earthing cable 10 N.
14.
Insert the cables through the cable glands and into the rotatable element.
15.
Tighten the cable gland nut to guarantee strain relief and protection class. (Cables and
connections must be compatible in order to guarantee the required protection class.)
16.
Connect the cable according to the enclosed wiring diagram. The wiring diagram is located
in the connection hood.
17.
The customer must provide earthing with an open cable lug on the threaded flange. To do
this, loosen the countersunk screw in the spanner flat and push on the cable lug.
18.
Check the connections for tightness.
19.
Attach the hood
20.
Attach the hood with the 2 countersunk screws.
21.
For units with an external adjustment, put the scale lever back on