![Schluter Systems BTEAR2WL Operating Instructions Manual Download Page 15](http://html.mh-extra.com/html/schluter-systems/btear2wl/btear2wl_operating-instructions-manual_1212776015.webp)
15
GB
1. Open/remove the cover of the cabinet.
2. Drill a hole into the inside of the cabinet using a power drill.
3. Route the cable through the drilled hole and screw the connection of
the adhesive antenna to the connection module WL.
4. Remove the protective film from the adhesive antenna and push the
adhesive antenna onto the outer edge of the cabinet.
5. Close the cover of the cabinet.
6. Commissioning
6.1 Commissioning the product
B
Verify that the modules are properly connected.
B
Verify that the product is properly mounted to the DIN rail.
1. Apply mains voltage.
- The green LEDs (operation) of the base module Control and of the product light up.
6.2 Connecting room sensors WL to the product
6.2.1 Preparation
B
Verify that the single room temperature controller is in operation and that the cover of the product has been removed.
B
Verify that the room sensors WL to be used have been exposed to sunlight for at least one day or that they have a battery.
B
Verify that the room sensors WL to be used are close to the product.
B
Verify that the rear sides of the room sensors WL to be used are numbered consecutively and marked with the place of use.
This helps to avoids subsequent confusion.
B
Verify that a paper clip bent open and a ballpoint pen are available.