Schier | SI-75 Installation Guide
4a
Install plain end fittings
4b
Connect interceptor to drain lines
4
Connect Piping
4" Plain End
Screw plain end fittings (included) into bulkhead fittings using pipe thread sealant or tape
approved for use with plastics. 6" connection types come pre-installed from the factory.
Place unit into final position and set level. Mechanically couple inlet and outlet drainage lines to
unit.
Do not solvent weld.
Ensure all upstream fixtures are trapped. Vent per local code. Installation
of 2-way cleanout tees to grade (by others) is recommended for buried installations.
Outlet
2-way
cleanout tee
Inlet
BURIED INSTALLATION
Kitchen floor
Add this vent if unit is installed
one or more floors below the
fixtures being served
Vent per local code
FLOOR BELOW INSTALLATION
COUPLING DETAIL
Drain
line
Flexible coupling
Plain end fitting
Bulkhead fitting
4" FPT
4" FPT
4" FPT