Page -5-
CAUTION:
NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE
FULLY EXTENDED AND LOCKED INTO POSITION.
STEP 1: HEATER AS RECEIVED OUT OF BOX.
BEFORE LIFTING OUTER SHELL PROTECT
HANDS. NEVER GRASP BARE METAL
WITHOUT HAND PROTECTION.
STEP 2: LIFT OUTER SHELL STRAIGHT UP. CARE
MUST BE TAKEN TO PROTECT HANDS DURING
LIFT.
MAKE SURE CLIP
GOES INTO SLOT
IN LOWER SHELL.
3 PLACES
STEP 3: LIFT OUTER SHELL UNTIL ALL
THREE CLIPS INGAGE SLOTS IN LOWER
SHELL. WHEN THIS HAPPENS, THE SCREW
HOLES WILL LINE UP.
LOCK SHELLS TOGETHER
AND CLIPS IN PLACE WITH
SCREWS IN EACH CLIP.
3 SCREWS TOTAL.
STEP 4: LOCK THE CLIP INTO PLACE WITH 3
SCREWS AS SHOWN. THE HEATER MUST NOT BE
OPERATED UNLESS THE OUTER SHELL IS
PROPERLY EXTENDED AND FULLY LOCKED
INTO PLACE.
CAUTION:
NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE
FULLY EXTENDED AND LOCKED INTO POSITION.
Models
80C/SPC-80C, 200C/SPC-200C