Operation Manual VISATRON® VN115/87plus EX
06/2016
Page 19
SCHALLER AUTOMATION
D-66440 Blieskastel / Saarland / Germany / Industriering 14 / P.O Box 1280
Industrielle Automationstechnik GmbH & Co. KG
Tel. +49(0)6842-508
-
0
/ Fax -260 / eMail: [email protected] / www.schaller.de
2.1.4
Installation of the siphon block connection units
Figure 11:
Connection unit
Consider the following points:
Take note of the drilling template (made of paper, included with the
connection units)
Drill through
Seal all threads with 'Loctite 572'
Max. torque = 30 Nm
OKAY
Wrong alignment
Wrong angles
Wrong distance
Figure 12:
Side view
Avoid wrong alignment, wrong angles and incorrect distances (see
Insert the suction funnel from the crankcase side into the siphon block, align
it in a vertical position (see
with the opening at the bottom
and fix the small clamping nut.
1
2
3