background image

 

Fire Damper Model BSK-RPR 

 

 

Additional operating instructions according to ATEX 94/9/EC 

 MODELS 

AND 

DIMENSIONS

 

Construction subject to change 

 

No return possible 

Version: 2015-08-17 | Document: Z09/46 | Page 11 

 
 

Summary of Contents for BSK-RPR Series

Page 1: ...0 200 D 78600 Kolbingen www SCHAKO de info SCHAKO de BSK RPR Fire Damper Contents GENERAL CONDITIONS 1 DESCRIPTION 3 MODELS AND DIMENSIONS 4 Additional operating instructions according to EC Certifica...

Page 2: ...operator s internal work operating and safety regu lations must be observed DESIGNATED USE The devices have been designed for use in ventilation sys tems in areas subject to explosion hazards accordin...

Page 3: ...rved in connection with these additional operating instructions For maintenance servicing retrofitting etc it may be nec essary to provide on site inspection openings in suspended ceilings shaft walls...

Page 4: ...10 BF 1 Housing 2 Damper blade 3 Hand lever 4 Locking profile 5 Trigger device 6 Fusible link 7 Mounting frame AR 8 Drive unit 9 Earthing connection 10 Drive X10 ExMax 5 10 BF 11 Safety temperature l...

Page 5: ...Version 2015 08 17 Document Z09 46 Page 5 BSK RPR S with mounting frame AR Figure 4 Dimensions of the BSK RPR S with mounting frame AR Figure 5 Dimensions of the BSK RPR S with mounting frame AR with...

Page 6: ...6 25 14 07 5 58 13 40 7 03 14 85 280 278 6 31 16 55 7 79 18 03 7 17 17 41 8 65 18 89 315 313 7 14 18 40 8 62 19 88 8 13 19 39 9 61 20 87 355 353 8 08 20 53 9 56 22 01 9 19 21 64 10 67 23 12 400 398 9...

Page 7: ...supply voltage in accordance with regula tions Technical data drive X10 ExMax 5 10 BF Power supply 24 240 V AC DC 10 each self adaptable Frequency 50 60 Hz 20 Power consumption Holding max 20 W Heatin...

Page 8: ...irement of statically load bearing lintels may have to be taken into considera tion Improper transport handling may result in dam age functional impairment In addition to that the film of the transpor...

Page 9: ...by contact or inhaling hazard ous substances must be excluded by taking appropriate safe ty measures Prior to maintenance or inspection all system components up and downstream of the device must be s...

Page 10: ...odel BSK RPR Additional operating instructions according to ATEX 94 9 EC MODELS AND DIMENSIONS Construction subject to change No return possible Version 2015 08 17 Document Z09 46 Page 10 Certificate...

Page 11: ...Fire Damper Model BSK RPR Additional operating instructions according to ATEX 94 9 EC MODELS AND DIMENSIONS Construction subject to change No return possible Version 2015 08 17 Document Z09 46 Page 11...

Reviews: