Assembly and commissioning
draft2go
BA-49-001-09
9 von 21
5
Assembly and commissioning
5.1
Explanation of various components
Tap
Lever
Stainless steel
faucet spout
NC valve
Flat fitting
5.2
Assembling the insulating jacket with KEG
Place the pre-chilled KEG onto the insula-
tor base, so that the NC valve
and the re-
cess in the top ring are in line with the drip
tray. Slide the drip tray into place on the
base.
The draft2go dispensing system must al-
ways be placed on a stable surface.
Fit the drip grill into place inside the
drip tray.